2010 Release
Refitting
-
Perform the removal steps in reverse order.
Tightening torques:
Bolts for points P and P': 120Nm.
QQ' mounting bolts to body: 105Nm.
Anti-roll bar tie-rod mounting bolt: 44Nm.
Point H nut: 37Nm.
Anti-rotation tie-rod mounting bolt on wishbone: 100Nm.
Point E nut: 105Nm.
Connecting torque rod mounting bolt on yoke: 105Nm.
Connecting torque rod mounting bolt on subframe: 105Nm.
Anti-roll bar
Removal
-
Remove the anti-roll bar tie-rod mounting nuts
1 -
(1) at the level of the anti-roll bar.
Remove the subframe (see. 4-2 Front axle/Front
2 -
load bearing components/Subframe).
3 - Remove the bar support bearings (2).
4 - Remove the bar.
Check the condition of the bearings and replace if
5 -
necessary.
Refitting
-
Perform the removal steps in reverse order.
Tightening torques:
Anti-roll bar bearing mounting bolts: 21Nm.
Anti-roll bar tie-rod mounting nuts: 44Nm.
Operations
E-19
Photos
1
2