BMW 5251 Service Manual page 139

Sedan/sport wagon 1997-2002 5 series e39
Table of Contents

Advertisement

Cylinder Head Removal and Installation
4
While maintaining tension on timing chain, rotate crankshaft
at vibration damper from 30" before TDC in direction of rota-
tion (clockwise) until number 1 cylinder is at TDC position
with line between the OIT (arrow) on front pulley lined up
with boss on lower timing chain cover.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents