BMW 5251 Service Manual page 261

Sedan/sport wagon 1997-2002 5 series e39
Table of Contents

Advertisement

-
Camshaft Timing Chain
- .
-
Measure gap (B) between secondary timing chain tensioner
and intake camshaft sensor wheel. Make note of distance.
To determine VANOS control travel:
Distance I3
-
distance A = a minimum of 8.5 mm
CAUTION-
I f
the adjustment travel is less than 8.5 m m the VANOS ad-
justment unit must be removed and readjusted. See VANOS
control unit, removing (M52 engine) and VANOS con-
trol unit, installing (M52 engine).
Remove special tools:
Cranltshaft locking tool.
Camshaft loclting tool set.
Air fitting.
*
VANOS cable adaptor.
-
Install VANOS oil line with new seal
-
Install oil baffle cover above intake camshaft.
-
Install cylinder head cover mounting studs to rear of head.
-
Install cylinder head cover,
Tightening
torques
Cylinder head cover
10
Nrn
(89
in-lb)
VANOS oil line
32
Nm
(24
R-lb)
VANOS solenoid to control unit
30
Nrn
(22
ft-lb)
-
Installation of remaining parts is reverse of removal.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents