G10 CMTS Installation Checklist
•
G10 CMTS Installation Checklist
•
•
•
•
•
•
•
Table 38: G10 CMTS Installation Checklist
•
•
Step
•
Preparation for Installation
•
•
Complete all checklists in "Prepare the Site"
•
Completely review the G10 CMTS Hardware Guide, including the safety precautions
•
Verify the contents of the shipping cartons
•
Verify the number of pre-installed modules and power supplies in the chassis is correct
•
•
Verify the contents of all accessory kits
•
Install the power supply faceplate and the air intake faceplate
•
Ground and Rack Mount the Chassis
•
Crimp the supplied two-ring lug connector to the earth ground strap
•
•
Attach the earth ground strap to the chassis
•
Ensure proper ventilation clearance surrounding the G10 CMTS
•
Install an equipment shelf in the rack
•
•
If applicable, install the rack mounting brackets
•
Slide the chassis onto the shelf and mount it to the rack
•
Attach the earth ground strap to earth ground
•
Install Power Supplies
•
•
Remove the power supply faceplate
•
Determine the bay in which to install the power supply
•
Remove the power supply filler panel
•
Release the ejector, align to the card guides, insert the power supply, and close the
•
ejector
•
•
Tighten the self-contained screws
•
Replace the power supply faceplate
•
Install a DOCSIS Module and an HFC Connector Module or SIM
•
Remove the air management module where the DOCSIS Module will be inserted
•
•
Release the ejectors, align to the card guides, insert the DOCSIS Module, and close the
ejectors
•
•
Tighten the self-contained screws
•
Remove the air management panel where the HFC Connector Module or SIM will be
•
inserted
•
Release the ejectors, align to the card guides, insert the HFC Connector Module or SIM,
•
and close the ejectors
•
Tighten the self-contained screws
•
•
•
•
•
•
•
•
90
JUNOSg 3.0 G10 CMTS Hardware Guide
Table 38 summarizes all the steps outlined in this document that are required to successfully
install the G10 CMTS in the headend. We recommend that copies of this table be made and
used to keep track of the installation status of each G10 CMTS.
Page Number
page 67
—
page 89
page 94
page 94
page 101
page 103
Completion Status