Initialization Phase; Data Collection - Magellan ProMark3 RTK Getting Started Manual

Hide thumbs Also See for ProMark3 RTK:
Table of Contents

Advertisement

Initialization count-down.
After selecting a point from the prompted list (see fig-
ures below), the unit will set the Site ID and Site
Description fields accordingly.
• Time on Site (sec): Occupation time on known point
(default: 15 seconds).

Initialization Phase

7. Tap the Log button at the bottom of the screen.
A screen is displayed showing the counting-down of the
initialization phase (see screen opposite). The Remain field
will count down beginning from the value of the Time on
site field set on the Survey Settings screen. At the end of
the countdown sequence, the Remain field is replaced with
the Elapsed field which reads "00:00:00".

Data Collection

8. Walk to the start point of the trajectory you want to survey.
Be careful not to mask the antenna as this might cause
loss of satellite signals.
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Promark 3

Table of Contents