Service And Maintenance - Weil-McLain GOLD CGt Manual

Natural gas-fired water boiler with tankless heater
Hide thumbs Also See for GOLD CGt:
Table of Contents

Advertisement

GOLD CGt Gas-Fired Water Boiler — Boiler Manual
10b
Service and maintenance —
Cleaning boiler heating
surfaces
1. Shut down boiler:
2. Follow shutdown procedure.
3. Remove venting system connection to boiler.
4. Remove top jacket panel. Turn back insulation.
5. Remove collector box/transition assembly. Clean
sealant from assembly and sections.
6. Remove radiation plates hanging between sections.
7. Remove burners from base. Brush and vacuum
burners to remove all dust and lint. Verify that all
burner ports are free of debris.
8. Place newspapers in base of boiler to collect soot.
9. Clean between sections with wire flue brush.
10. Remove newspaper and soot. Vacuum or brush base
and surrounding area.
11. Reinstall radiation plates.
12. Replace collector box/transition assembly. Seal
with sealant. Obtain gas-tight seal to prevent flue
gas spillage and carbon monoxide emissions,
resulting in severe personal injury or death.
13. Replace insulation and jacket top panel.
14. Start up boiler following section
this manual and the boiler
Excessive sooting indicates improper gas
combustion. If found check for proper combustion
and make any necessary adjustments.
42
Follow "
To Turn Off Gas to Appliance
instructions on boiler and
.
instructions
Do not drain boiler unless it will be exposed to
freezing temperatures. If using antifreeze in
system, do not drain.
Operating instructions
The boiler contains ceramic fiber
and fiberglass materials. Use care
when handling these materials per
instructions on
manual. Failure to comply could
result in severe personal injury.
Review with owner
1. Review the
2. Emphasize the need to perform the
"
Operating
3. Remind the owner of the need to call in a
4. Remind the owner to follow the proper
, pages 30-32 of
7
.
of this
page 64
(continued)
User's Information Manual
the owner.
maintenance schedule specified in the
(and in this manual as
Information Manual
well).
licensed contractor should the boiler or
system exhibit any unusual behavior.
shutdown procedure and to schedule an
annual start-up at the beginning of the next
heating season.
Part Number 550-110-290/0501
with
User's

Advertisement

Table of Contents
loading

Table of Contents