Weil-McLain GOLD CGt Manual page 18

Natural gas-fired water boiler with tankless heater
Hide thumbs Also See for GOLD CGt:
Table of Contents

Advertisement

GOLD CGt Gas-Fired Water Boiler — Boiler Manual
3f
Venting — direct exhaust.........................
1. Do not mix types or manufacturers of vent materials.
2. Clean all joints before sealing. See vent manufacturer's instructions for
cleaning and sealing joints. Use their specified sealant. Do not use screws.
3. Install vent pipe with seams on top of vent horizontal runs. Follow
requirements in section
3e
4. Maintain minimum 2" clearance from combustible materials to vent
pipe.
5.
— See
Vertical venting
instructions for venting through roof.
Vent pipe must extend through roof flashing, jacket or thimble.
Vent may pass through floor, inside wall or concealed space when
installed according to vent manufacturer's instructions.
— See
Sidewall venting
least one foot above anticipated snowline. Vent must be terminated
only with:
Tee or elbow with integral screen. Tee must be mounted vertically.
Elbow and termination coupling with screen (not available for
StaR-34).
6. Do not seal vent pipe (slip connector for Saf-T Vent) to inside or outside
plate.
7. If passing through noncombustible wall, provide hole diameter large
enough to insert the vent pipe (slip connector for Saf-T Vent).
8. Install horizontal drain tee as close as possible to boiler, in first
horizontal run. See
Figure 13
9. Do not exceed the maximum vent system length given in
page 15.
Condensate drain line — use only silicone tubing
rated for at least 400 °F for the condensate drain line.
Using any other material could cause flue gas leakage, potentially
resulting in severe personal injury, death or substantial property
damage.
On some installations, the condensate drain fitting
may be omitted, provided:
Vent manufacturer shows this option in their instructions.
Vent is sloped toward termination as shown in dotted lines in
.
14
The vent is installed per Weil-McLain and vent manufacturer's
instructions.
Condensate drippage from such vents may accumulate on the ground
below. Consider traffic in the area to avoid hazard due to ice accumulation.
Ice buildup may also block vent.
18
, page 17, for vent termination.
. Follow vent manufacturer's
Figure 13
. Vent must terminate at
Figures 14 and 15
.
Figure 13 Direct exhaust vertical venting
OR
Alternate construction:
Use vertical drain tee as
shown at left.
071015
Figure 14 Direct exhaust sidewall venting
Follow vent
manufacturer's instructions for
,
Table 4
proper installation of vent runs,
including slope, support and
condensate drainage.
Figure
Optional downward slope without drain
fitting, where allowed by vent manufacturer
as explained in CAUTION above left.
071016
Follow vent manufacturer's
OR
instructions for proper installation
of vent runs, including slope,
support and condensate drainage.
Install termination tee (with screen)
on top of vent line as shown. Vent
may also terminate directly up, as
shown (no screen required).
Horizontal drain tee. Follow vent
manufacturer's instructions to install
condensate drain line.
Horizontal drain tee.
Follow vent
manufacturer's
instructions to install
condensate drain line.
Part Number 550-110-290/0501

Advertisement

Table of Contents
loading

Table of Contents