Wiring The System; Installing The Unit - Dometic 457915.30X Installation Instructions Manual

Roof top unit
Hide thumbs Also See for 457915.30X:
Table of Contents

Advertisement

J. Wiring The System
1. 120 VAC Power Supply Connection
Disconnect 120 VAC. Failure to obey these
instructions could create a shock hazard
causing death or severe personal injury.
This product is equipped with a 3 wire (ground-
ed) system for protection against shock haz-
ard. Make sure that the unit is wired and that
you connect into a properly grounded 120 VAC
circuit and the polarity is correct. Failure to
do so could result in death, personal injury
or damage to the equipment.
a. Route the 120 VAC supply wire through the
strain relief in the SZLCD control box. Tighten
strain relief, making sure enough wire is in-
side SZLCD control box to connect with unit
120 VAC wires.
b. Connect the white to white; black to black;
and green or bare copper wire using appro-
priate size wire connectors. See chart on
page 3.
c. Push the wires into the SZLCD control box.
If control box is plastic, install the cover with
the four blunt point screws provided; if metal
install cover with the one blunt point screw
provided.
2. Low Voltage Wire Connections At The SZLCD
Control Box.
Disconnect the positive (+) 12 VDC terminal
at the supply battery. Damage to equipment
could occur if the 12 VDC is not shut off.
Note: If a solar panel is to be installed see instructions
packaged with solar panel option.
Note: Plastic SZLCD control boxes only. Plug the sup-
plied 4 wire harness and the supplied 2 blue wires into
their matching connectors in the SZLCD control box.
a. Connect the previously run +12 VDC supply
wire to the red wire from the SZLCD control
box.
b. Connect the previously run –12 VDC supply
wire to both the black wire from the SZLCD
control box and to wire of the three wire cable
that goes to the thermostat 12V– terminal.
c. Connect the previously run furnace thermo-
stat wires (if applicable) to the blue wires
coming from the SZLCD control box.
d. Connect the red/white wire from the SZLCD
control box to wire of the three wire cable that
goes to thermostat 12V+ terminal.
e. Connect the orange wire from the SZLCD
control box to wire of the three wire cable that
goes to thermostat COMMS terminal.
K. Installing The Unit
1. Install the SZLCD control box on the ceiling tem-
plate as shown in FIG. 12. Drive two (2) #6 x 3/8"
(plastic control box) or #10 x 3/8" (metal control
box) blunt point Phillips head screws (provided)
through the ceiling template into holes in the
SZLCD control box to hold into place.
FIG. 12
Metal Electronic
Control Box Shown
Curb Side
2. If your installation includes the optional electric
heat kit, (457915 & 459516 models only) install it
at this time. Follow the instructions with the heat
package for its installation procedure.
3. Hold the ceiling template up to the 14-1/4" x 14-1/4"
(±1/8") opening. Be sure the large plate faces the
rear of the RV. See FIG. 13.
4. Start each mounting bolt through the ceiling tem-
plate and up into the unit base pan by hand. Install
wood screw in each end of the ceiling template.
This insures a tight fit of the return air cover to
ceiling. See FIG. 13.
FIG. 13
Wood
Screws
Finger
Tight
9
Blunt Self-Tapping
Screw
Front of Vehicle
Roof
Gasket
Tighten To Com-
press Gasket To
1/2"
Front

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

457915.70x459516.30x459516.70x

Table of Contents