G. Wiring The System
Disconnect 220 - 240 VAC. Failure to follow
these instructions could create a shock haz-
ard causing death or severe personal injury.
Important:
The electrical installation must be done
by an authorized electrician. In some areas electricians
must be licensed.
1. 220 - 240 VAC power supply connection
a. Connect the power supply line to the unit at
the terminal block provided in the junction box.
Connect to red, black and green/yellow wire
(Active, Neutral and
12.
FIG. 12
Strain
Relief
Terminal
Block
b
Tighten the strain relief onto the power supply
line to hold fi rmly in place. Be careful not to
damage wires. See FIG. 12.
c. Carefully push all excess wire back into the
junction box. Place cover edge under tabs and
snap cover in place and secure with screw.
See FIG. 13.
FIG. 13
Install
Screw
respectively). See FIG.
Snap Cover
In Place After
Wires Are
Connected
H. Air Distribution Box Installation
Important:
The inner walls of the ADB go inside the
walls of the ceiling template during installation.
1. Working from the rear looking forward with the
rear tipped down 80 mm place the air distribution
box inner walls against the inside of the template
walls. Pull the air distribution box backwards until
it touches the template. Raise the air distribution
box to the ceiling. See FIGS. 14 & 15.
FIG. 14
Raise Back
End Of ADB
To Ceiling
Push Here To Engage
Latches, Then Remove Labels
FIG. 15
Auxiliary Screw Locations
Auxiliary Screw
Locations
29
P o s i t i o n
ADB Walls
Inside And
Against End
Of Template
Walls
Install 2 Primary
Mount Screw First