Laundry Tub Installation:

For this type of installation, the drain hose MUST be
secured to the stationary tub to prevent hose from
dislodging during use. Refer to Figure 10. Use the
beaded strap (supplied in accessories bag) to secure
hose.
1
2
1
Drain Hose
2
Tie-Down Strap (tape if necessary)
Figure 10
802714R5
SWD600N
SWD600N
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
Step 5: (Gas Dryer Only) Connect Gas
Supply Pipe
WARNING
To reduce the risk of gas leaks, fire or
explosion:
• The dryer must be connected to the type
of gas as shown on nameplate located in
the door recess.
• Use a new flexible stainless steel
connector.
• Use pipe joint compound insoluble in L.P.
(Liquefied Petroleum) Gas, or Teflon tape,
on all pipe threads.
• Purge air and sediment from gas supply
line before connecting it to the dryer.
Before tightening the connection, purge
remaining air from gas line to dryer until
odor of gas is detected. This step is
required to prevent gas valve
contamination.
• Do not use an open flame to check for gas
leaks. Use a non-corrosive leak detection
fluid.
• Any disassembly requiring the use of
tools must be performed by a suitably
qualified service person.
7. Make certain your dryer is equipped for use with
the type of gas in your laundry room. Dryer is
equipped at the factory for Natural Gas with a
3/8 inch NPT gas connection.
NOTE: The gas service to a gas dryer must
conform with the local codes and ordinances, or in
the absence of local codes and ordinances, with the
latest edition of the National Fuel Gas Code ANSI
Z223.1/NFPA 54 or the CAN/CSA - B149.1 Natural
Gas and Propane Installation Code.
Natural Gas, 1000 Btu/ft
be supplied at minimum 5.0 inch water column
pressure to maximum 10.5 inch water column
pressure.
For proper operation at altitudes above 3000 feet
(915 m) the natural gas valve spud orifice size must be
reduced to ensure complete combustion. Refer to
Table 1.
3
3
(37.3 MJ/m
) service must
W316