CGa Gas-Fired Water Boiler
Start-up —
Inspect base insulation
The boiler contains ceramic fiber and fiberglass materials. Use care when
handling these materials per instructions on
to comply could result in severe personal injury.
Failure to replace
in a fire hazard, causing severe personal injury, death or substantial property
damage.
Check to make sure
insulation is secure
damaged or displaced,
Start-up —
DO NOT
filled with water and all instructions and procedures of previous manual
sections have been completed. Failure to do so could result in severe personal
injury, death or substantial property damage. Before starting the boiler . . .
Table 5 Lighting/Operating instruction location guide
Models Standing pilot
CGa-25
to
CGa-6
CGa-7
to
CGa-8
preparation
damaged insulation or reposition insulation can result
against all four sides of the base. If insulation is
operate boiler. Replace or reposition insulation.
do not
operate boiler
proceed with boiler operation unless boiler and system have been
Read manual
and the
Section 8/9
procedure (see
, below).
Table 5
Verify the boiler and system are
Verify the
Start-up preparation
completed.
Gas
Natural or
Honeywell VR8200/VR8300
Propane
Robertshaw 7200
Natural
Natural or
Honeywell VR8200/VR8300
Propane
Robertshaw 7200
Natural
continued
of this manual. Failure
page 68
Lighting/Operating instruction
.
full of water
procedures of
have been
Section 6
Page Spark-ignited pilot
Gas
35
Honeywell VR8204/VR8304 Natural
Robertshaw 7200
Natural
36
White-Rodgers 36E
Natural
35
Honeywell VR8204/VR8304 Natural
36
White-Rodgers 36C
Natural
Part Number 550-110-593/1099
Page
40
41
42
40
43