Welding - York R-410A Technical & Service Manual

Variable refrigerant flow a/c system none modular digital scroll r-410a 50 hz
Hide thumbs Also See for R-410A:
Table of Contents

Advertisement

___________________________________________________________________________________
Don't place the pipe on the ground directly or scratch with the ground.
Cut the pipe and remove burrs with the cut surface downward.
Be sure to place a cap when raining.

4.6.2 Welding

1) Be sure to weld horizontally or downward, not upward.
2) Pay attention to the installation direction and angle to prevent oil-return or oil-accumulation.
3) Its necessary to charge nitrogen when welding.
Be far away from fire and prepare fire extinguishers and water to prevent fire on field.
Be careful not to injure people.
Confirm the proper clearance between pipe and connector.
Check if the supporting structural members are strong enough.
The traverse distances between supporting structural members are as follows:
Diameter (mm)
Max. Distance (m)
___________________________________________________________________________________
Below 20
1.0
- 257 -
Installation
25~40
1.5
50
2.9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yds-100wc15aYds-140wc35aYds-100wc35aYds-280wc35a

Table of Contents