Connecting the Calibration Gas Cylinder to the Dock(s)
2.7.1 Single Cylinder to Single Dock
1.
Insert the demand flow regulator into the calibration gas cylinder.
2.
Slide the open end of the tubing assembly over the regulator.
3.
Connect the end of the tubing with the white quick disconnect fitting
to the toxic GAS port on the dock (see
4.
Proceed to
Section 2.7.3
fresh AIR port.
11
Figure
2).
Figure 1.
for further instructions concerning the
2.7.2 Single Cylinder to Multiple Docks
When multiple IQ docks are connected to a single cylinder of calibration
gas, a manifold is used to disperse the calibra tion gas from the cylinder
to the docks.
The manifold is a Honeywell Analytics part and includes a detailed instruction
sheet for its use. The manifold comes with tubing and fittings necessary for
connecting up to eight docks to a single cylinder of calibration gas.
IQ Force™ Dock Reference Manual