Install Iq Administrator Pro, Database Manager, And Postgresql Database; Power And Connectivity; Pc - Single Dock Via Usb; Pc - Multi Dock Via Usb - Honeywell IQ Force Dock Reference Manual

Dock
Table of Contents

Advertisement

Install IQ Administrator Pro, Database Manager, and PostgreSQL database

Install IQ Administrator Pro, Database Manager, and PostgreSQL database.
NOTE
Do not launch the IQ Force dock software again until
the instruc tions in
been completed.
9
Section 2.5
to
Section 2.8
below have
2.5 Install IQ Administrator Pro, Database
Manager, and PostgreSQL database.
Proceed to the IQ Administrator Pro Reference Manual and follow the
instructions to create and specify the PostgreSQL database.

2.6 Power and Connectivity

This section covers providing power to the IQ Force docks and connecting
them to your PC. The instructions given below pertain to standard
connections via the PC's USB port.
IQ Force docks that are Ethernet-ready are shipped with an Ethernet
Instruction booklet. Proceed to the Ethernet Instruction booklet if you are
planning to connect the dock to the PC via Ethernet. Once the instructions
in the booklet have been followed and the IQ Force dock is connected,
return to
Section 2.7
for calibration-gas cylinder connection instructions.
2.6.1 PC – Single Dock via USB
For single dock setups that will be run from the PC via USB, the power from
the PC via the USB cable is sufficient to power the dock. Simply connect
the dock to the PC with the USB cable that was included with the dock and
proceed to
Section 2.7
for instructions concerning calibration gas.
NOTE
USB cable length from PC to dock may not exceed 10 feet.
IQ Force™ Dock Reference Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq force

Table of Contents