Troy-Bilt Storm Tracker 2890 Operator's Manual page 9

Two-stage snow thrower
Hide thumbs Also See for Storm Tracker 2890:
Table of Contents

Advertisement

7.
Remove the hairpin clip from the rear of the chute control
assembly. See Figure 3-7a.
8.
Insert chute directional control rod into rear of the chute
control assembly. See Figure 3-7b. Secure the chute
directional control rod to the chute control assembly with
the hairpin clip removed earlier.
Figure 3-7
Set-Up
Shear Pins
Replacement auger shear pins and bow tie cotter pins are
included with your snow thrower. Store them in your snow
thrower's dash panel until needed. See Figure 3-8.
a
b
Chute Clean-Out Tool
The chute clean-out tool and cord are fastened to the top of the
auger housing with a mounting clip and a cable tie at the factory.
Cut the cable tie before operating the snow thrower.
See Figure 3-9.
Figure 3-8
Chute Clean-Out Tool
Figure 3-9
S
3 — A
& S
ection
SSembly
et
-U
9
p

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents