Rail Extension - IBM TotalStorage FAStT600 Installation And User Manual

Fibre channel storage server
Hide thumbs Also See for TotalStorage FAStT600:
Table of Contents

Advertisement

5
5
Clip
Clip
nuts
n
uts
Figure 14. Rack nut installation
6. On the rail marked R, remove the 6/32 in. screw 3 and loosen the four screws
2 ; then hold the front of the rail against the outside of the right
rack-mounting-flange and loosely install two M6 screws 1 .
Extend the rear of the rail outside of the rear rack-mounting-flange; then install
and tighten two M6 screws 4 . Tighten the front screws 1 and repeat this
step for the other rail.
6
6
Figure 15. Rail extension
7. Tighten the rail adjustment screws 1 on both rails.
Cage
Cage
nuts
n
uts
Cage
Cage
nuts
n
uts
Chapter 2. Installing and configuring the storage server
21

Advertisement

Table of Contents
loading

Table of Contents