18. Bring the electrical cables into the
case.
19. Strip a short section of the electrical
cables.
20. Fit an earth sleeve to the earth wire.
21. Loosen the screws in the terminal
block and insert the bare wires into
the clamps:
L (Live) = Brown Wire
E (
) (Earth) = Green Sleeved Wire
N (Neutral) = Blue Wire
Note! Do not twist the cores of the
wires or strain the cables to make
them reach the terminal block.
22. Tighten the screws in the terminal
block so that they securely clamp the
bare wires.
23. If necessary, fit an earth bonding
clamp to the supply pipe and make
sure that the bonding complies with
the relevant regulations in force at the
time of installation.
24. Replace the service tunnel.
25. Replace the cover. If the cover does
not fit easily, rotate the knobs slightly
so that they fit onto the spindles. Do
not force the cover.
26. Tighten the three retaining screws.
27. Install the shower fittings, refer to your
Shower Fittings Installation and User
Guide.
Shower
Service Tunnel
17
Retaining Screw
Retaining Screws