● Procedure for connection to BU1002SW output terminal block
When in use, make sure the output terminal block cover is attached.
Do not turn ON the power switch when it is detached.
● Voltage is applied to the output terminal block when the power switch is ON, which can
result in electric shock.
When connecting a device to the output terminal block, make sure to
include an emergency stop switch (ESD) between them.
● In the event of an accident, the power supply to the device can be stopped by pressing
the emergency stop switch.
● A disconnect switch shall be provided by others for ac output terminal block circuit.
● To reduce the risk of fi re, connect only to an emergency stop switch (ESD) overcurrent
protection for 15 amperes rating in accordance with the National Electric Code, ANSI/
NFPA 70, when using the UPS as a device conforming to UL, CE standard.
(1) Remove the terminal block cover on the lower right side of the unit's
rear panel.
(2) Connect the units that need to be backed up. Two types of connections
can be made.
1) To turn ON/OFF at the same timing as that of output receptacle B:
L1B terminal: Connect the line
L2B terminal: Connect the neutral line
2) To turn ON/OFF at the same timing as that of output receptacle C:
L1C terminal: Connect the line
L2C terminal: Connect the neutral line
Run the wires to be connected through the hole in the included terminal block cover (with cable
clamp and cable guard tube). (See Figure 1.)
If you have trouble running the wire through the hole, loosen the cable clamp dial by turning it
counter-clockwise.
Connect the ground wire to the G terminal.
Use a fl at head screwdriver to loosen the terminal block screws, insert the wire, and then retighten
the screws. (See Figure 2.) Refer to Table 1 for wire sizes.
Figure 1
(3) Insert the tab on the right side of the terminal block cover (with
cable clamp) into the unit's body, and fasten the previously
removed screws to the two locations on the left side of the cover.
Tighten the cable clamp dial to stabilize the wire. (See Figure 2.)
emergency stop
switch (ESD)
UPS
ESD
Figure 2
Table 1
Connectable wire size
Amount of stripped wire
Tightening torque
Recommended cable size
BU
Caution
Load
1.0 to 2.5 mm
5.5mm
0.9Nm (8 lb-in)
2
2mm
(AWG14)
1002
3002
SW / BU
<BU1002SW>
Figure 3
2
SW
1
2
3
4
5
6
7
8
9
10
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powli bu3002swBu1002swBu3002sw

Table of Contents