Omron Powli BU1002SW Instruction Manual page 25

Uninterruptible power supply (ups/200 to 240v specifications)
Hide thumbs Also See for Powli BU1002SW:
Table of Contents

Advertisement

2
. Installation and Connection
<Installing the BU3002SW vertically>
● Stabilize the casters
● How to stabilize the fi xed stand
Use a monkey wrench or spanner to loosen the fi xed
stand nuts.
Unscrew the feet of the fi xed stand until they reach
the fl oor.
Continue to unscrew the feet of the fi xed stand until
the casters no longer touch the fl oor.
Once the fi xed stand feet are fi rmly on the fl oor, turn
the nuts counter-clockwise to tighten them and lock
the feet in place.
* The feet can be anchored to the fl oor with screws if you use BUP300S mounting brackets (sold
separately).
Refer to the BUP300S instruction manual for more details.
<Installing the BU3002SW horizontally>
● How to remove the bottom casters
Install the BU3002SW so that the control panel is facing upward.
Loosen the screws in the 6 locations shown in the diagram below.
Remove caster mounting plate.
* BUP300S mounting brackets (sold separately) can be used for easy mounting on an EIA/JIS 19-
inch rack.
Refer to the BUP300S instruction manual for more details.
12
Casters unlocked
Casters locked

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powli bu3002swBu1002swBu3002sw

Table of Contents