Install the air baffle.
5.
Install the access panel (on page 20).
6.
Install the server into the rack
7.
Connect each power cord to the server.
8.
Connect each power cord to the power source.
9.
Power up the server (on page 18).
10.
("Installing the server into the
rack" on page 30).
Operations 25