Chapter 4. - Installing Additional Cabinets
9. Connect the power supply to switch box AC cables to the power supply units of
10. Connect the ground wires of the expansion AC cables connected to the power
Figure 4-18. Power Supply AC Cable to Frame Ground Connections
4-16
the top, middle and bottom cabinets.
units to the chassis.
DBS 576 (USA), issued 6/2/98