Figure 4-17 Switch Box Ac Cables To Frame Ground Connections - Panasonic DBS 576 Technical Manual

Section 300 installation
Hide thumbs Also See for DBS 576:
Table of Contents

Advertisement

Section 300-Installation
8. Connect the ground wires of the power cables connected at the switch box to the
Figure 4-17. Switch Box AC Cables to Frame Ground Connections
576-13-300
frame ground. One cable is supplied with switch box and one cable is supplied
with the expansion cabinets.
DBS 576 (USA), issued 6/2/98
Chapter 4. - Installing Additional Cabinets
4-15

Advertisement

Table of Contents
loading

Table of Contents