Evaporator Disassembly - Follett Symphony 25CI400A Installation, Operation And Service Manual

Ice and water dispensers
Hide thumbs Also See for Symphony 25CI400A:
Table of Contents

Advertisement

Fig. 24 – Water-cooled only
24.1
13. Use hooks on ice machine electrical box to hang
box on bracket (Fig. 24.1).
14. Remove ice machine from dispenser (Fig. 24.2).
Fig. 25 – All models
• Electrical box must be in "UP" position
before supplying power
• Start relay is gravity sensitive, and MUST
be in "UP" position
• Failure to comply may cause equipment
to overheat, resulting in equipment failure,
equipment damage or fire hazard
18
24.2
WARNING
!

Evaporator disassembly

Note: The upper bearing, lower bearing and auger
assemblies must be replaced as assemblies. The bottom
and top bearing assemblies cannot be fi eld assembled to
factory specifi cations (Fig. 26).
1. Disconnect power to ice machine.
2. Shut off water to ice machine.
3. Drain evaporator and fl oat tank.
4. Disconnect plastic tubing from evaporator water
inlet.
5. Disconnect compression nozzle tubing and reservoir
overfl ow tubing from secured clip.
6. Remove nut and upper vee-band coupling from top
of evaporator.
7. Lift top bearing assembly straight up with a slight
rotating motion and remove.
8. Remove ice compression loop located at top
of auger.
9. Lift auger straight up and out of evaporator.
10. Remove nut and lower vee-band coupling from
bottom of evaporator.
11. Lift evaporator to clear bottom bearing assembly.
12. Loosen hex head bolt in side of mounting base with
5/16" wrench and lift lower bearing assembly.
13. Remove condensate shield.
14. Remove four Allen head machine screws holding
mounting base to gearbox.
15. If replacing evaporator, remove compression nozzle
from evaporator port.
Fig. 26
25CI400A/W • 25HI400A • 50CI400A/W • 50HI400A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents