PRE-USE CHECK LIST
1.
Place the unit in a location near the final installa-
tion area and follow the procedures below.
2.
Open the stove and remove all the parts and
articles packed inside. Inspect all the parts and
cast iron body for shipping damage. Contact
your dealer if any irregularities are noticed.
3.
All safety warning have been read and fol-
lowed.
4.
This Owner's Manual has been read.
5.
Floor protection requirements have been met.
6.
Chimney connector is properly installed.
7.
The proper clearances from the stove and chim-
ney to combustibles materials have been met.
8.
The masonry chimney is inspected by a pro-
fessional and is clean, or the factory-built
metal chimney is installed according to the
manufactuer'rs instrucitons and clearances.
9.
The chimney meets the required minimum
height.
10.
All labels have been removed from the glass
doors.
11.
Plated surfaces have been wiped clean.
CAUTION!
DO NOT TILT THE UNIT ON THE CAST IRON LEGS.
Lift the unit upright and place it into position on the floor
protector.
September 1, 2008
Cumberland Gap Wood Stove
VENTING SYSTEM ........................................................ 4
INSTALLATION
OPERATION
PARTS DIAGRAM .....................................................28
7006-188E
TABLE OF CONTENTS
as a thimble ..........................................................13-14
Air controls ...........................................................21
Building a fire .......................................................22
Opacity .................................................................24
Burn rates ............................................................24
Ash removal .........................................................25
R
Page 3