Metal Prefabricated Chimney - Quadra-Fire CUMBGAP-PMH Instruction Manual

Cumberland gap non-catalytic, front/side load, wood heater
Table of Contents

Advertisement

When a metal prefabricated chimney is used, the manufacturer's installation instructions must be followed precisely. It will be
necessary to install the ceiling support package or wall pass through, "T" section package, firestops (when needed), insulation
shield, roof flashing, chimney cap, and any other materials deemed necessary by the prefabricated chimney manuafacturers'
instructions. Maintain the proper clearance to the structure as recommended by the chimney manufacturer. This clearance
is usually a minimum of 2" (51mm), although it may vary by manufacturer or for certain components. Follow the chimeny
manufacturers' instructions carefully.
There are basically two methods of metal chimney installation. One method is to install the chimney inside the residence through
the ceiling and the roof. Install an attic insulation shield to maintain the specified clearance to insulation. Insulation in this air space
will cause a heat buildup which may ignite the ceiling joists. This method of installation requires, at minimum, a ceiling support
package, an insulation shield and roof flashing. See Figure 15A.
The other method is to install an exterior chimney that runs up the outside of the residence. See Figure 15B. The components
illustrated may not look exactly like the system you purchase, but they demonstrate the basic components necessary for a proper
and safe installation.
The chimney must be the required height above the roof or other obstruction for safety and for proper draft operation. The require-
ment is that the chimney must be at least 3 ft. (91cm) higher than the highest point where it passes through the roof and at least 2
ft. (61cm) higher than the highest part of the roof or structure that is within 10 ft. (305cm) of the chimney, measured horizontally.
(See page 11)
Figure 15A
Listed Cap
Maintain 2" (51mm)
Clearance
Listed Chimney
Ceiling Support
Chimney
*
Connector
*
Floor
Protector
NOTE: ALL HORIZONTAL INSTALLATIONS REQUIRE ACCESSORY HORIZONTAL FLUE SHIELD, PART
HTSHLD-7006, TO COMPLY WITH REQUIRED CLEARANCES.
NOTE: OPTIONAL FIRE SCREEN, PART SCR-7006, CAN ONLY BE USED IN FULL VERTICAL INSTALLATIONS.
I
MPORTANT! FOLLOW THE CHIMNEY MANUFACTURERS' INSTALLATION INSTRUCTIONS AND MAINTAIN
CLEARANCES AS SPECIFIED ON PAGES 6-8.
In Canada, when using a factory-built chimney, make sure it is safety listed, Type UL 103 HT CLASS "A"
or conforming to CAN/ULC-S629, STANDARD FOR 650°C FACTORY-BUILT CHIMNEYS.
September 1, 2008
Cumberland Gap Wood Stove
CONNECTION TO A METAL PREFABRICATED CHIMNEY
INTERIOR CHIMNEY
Listed
Chimney
Combustible
Storm Collar
Ceiling
Joists
Flashing
Ceiling
Chimney
Support
Connector
To Stove
Combustible Wall
*
Refer to Clearances
to Combustibles
Figure 15B
Attic
Insulation
Shield
Specified
Clearance
Maintain 2" (51mm)
Clearance Through Eave
Combustible
Ceiling
Chimney
Floor
Protector
7006-188E
EXTERIOR CHIMNEY
Listed
Chimney Pipe
Chimney
Connector
Listed Cap
To Stove
Trim Collar
on Inside
Wall
Flashing
*
Insulated "T"
*
*
Combustible Wall
*
Refer to Clearances to Combustibles
R
Combustible Outside Wall
2" (51mm)
Clearance
Listed Chimney
Insulated "T"
Wall Support
Wall Spacer on
Outside Wall
Page 15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cumbgap-mbk

Table of Contents