Replacing The Contracture Footplate Heel Loop - Invacare Solara Spree GT Owner's Operator And Maintenance Manual

Table of Contents

Advertisement

SECTION 14—CONTRACTURE FOOTPLATE OPTION
Bilateral Contracture
Mounting
Holes
Lock Nut
Washers
FIGURE 14.7 Contracture Footplate Height Adjustment

Replacing the Contracture Footplate Heel Loop

NOTE: For this procedure, refer to FIGURE 14.8.
NOTE: This procedure applies to the bilateral contracture footplate only.
1. Tilt the contracture footplate forward to gain access to the mounting screws that
secure the heel loop to the underside of the contracture footplate. Refer to Angle
Adjustment of the Contracture Footplate on page 88.
2. Remove the four mounting screws and washers that secure the existing heel loop to
the contracture footplate.
3. Reverse STEPS 1-2 to install the new heel loop.
Mounting Screws
Washers
FIGURE 14.8 Replacing the Contracture Footplate Heel Loop
®
Solara
/Spree GT
Contracture Support
Mounting Bolts
Coved Washers
Footplate Bracket
(Support - Contracture
Platform Not Shown)
Washers
Heel Loop
90
Contracture Platform
Locknuts
Contracture Platform
Contracture Footplate
Upper
Support
Mounting
Bolts
Part No 1125027

Advertisement

Table of Contents
loading

This manual is also suitable for:

SolaraSpree gt

Table of Contents