Appliance Preparation; Top Vent - Heat & Glo RED40 Owner's Manual

Natural gas
Hide thumbs Also See for Heat & Glo RED40:
Table of Contents

Advertisement

9 9

Appliance Preparation

A. Top Vent
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during instal-
lation. Sheet metal edges are sharp.
1. Remove seal cap by lifting up and off of the starting
collar.
2. Place fi rst twelve inch vent section on the starting collar.
WARNING! Risk of Fire!
cal pipe is required prior to attaching any elbow to the appli-
ance.
3. Place fi berglass rope ring over initial twelve inch vent
section and position tightly to top of appliance.
FIBERGLASS ROPE RING
Figure 9.1 Location of Fiberglass Rope Ring
A MINIMUM of twelve inches verti-
Heat & Glo • RED40, RED40ST • 2155-900 Rev. F • 8/09
35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Red40st

Table of Contents