Plumbing - Aquatic Serenity Series Owner's Manual & Installation Manual

Serenity series
Table of Contents

Advertisement

iNSTALLATiON iNSTruCTiONS

PLumBiNg:

1. After securing tub in place, normal waste and overflow, water spout and valves are installed per normal plumbing
procedures, in accordance with all state and local standards.
2. install standard 1-1/2" trap to drain and overflow. Before proceeding, make final operational check by filling tub with
water to overflow and operate blower for 5 minutes. carefully check for leaks both while blower is running and after
it has been turned off. Allow water to stand in tub for at least 30 minutes before draining. AquATiC iNduSTriES,
iNC. wiLL NOT BE rESPONSiBLE FOr wATEr dAmAgE OF ANy KiNd.
3. when selecting fill spout location, check to ensure that spout is long enough to clear the tub rim from its desired
location. if installation is to be on the tub deck, check the back side of tub for adequate space for connection to water
lines and that there are no air channels running under that area of the tub rim before drilling or cutting tub.
4. A service access panel of a minimum of a 16" square must be provided adjacent to blower and control box
assembly.
AquAtic industries, inc.
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents