Variable Speed Air Blower Remote Mounting - Aquatic Serenity Series Owner's Manual & Installation Manual

Serenity series
Table of Contents

Advertisement

iNSTALLATiON iNSTruCTiONS

VAriABLE SPEEd Air BLOwEr rEmOTE mOuNTiNg

rELOCATiNg ThE VAriABLE SPEEd Air BLOwEr:
All electrical connections should be done by a licensed electrician. the
blower and controls are installed at the factory. if you wish to install
the blower for a more convenient access, please follow the instructions
provided below.
dESigNATiNg A rEmOTE LOCATiON:
the designated location for the blower must not require more than 15
feet of pipe and 6 directional changes. choose a place as close to
the bath as possible to make sure that the system works properly. the
chosen place must not be cluttered and/or dusty and must allow for
sufficient air circulation. this space must not be smaller than 4 cubic
feet and must have a ventilation opening not smaller than 2" x 4". the
air around the blower should be approximately 72°F (20°c) or higher
for optimal performance.
the blower and control box must be accessible at all times.
the extension cords must be able to reach the control box and be routed per local code requirements.
rEmOViNg COmPONENTS FrOm ThE BASE:
1. disconnect the key pad cable from the control box, and then add the extension cable.
2. disconnect the blower cable from the control box.
3. disconnect the chromatherapy light wiring from the connectors at the control box, and then add the extension
cable. Be careful when disconnecting the chromatherapy Led light connectors. Hold the connectors, not the wires,
so that the wires do not pull out of the connectors.
4. disconnect the water sensor wires from the control box, then add the extension cord.
5. remove the screw attaching the PVc pipe to the blower.
6. remove the blower and control box from the ABs support base.
iNSTALLiNg ThE BLOwEr iN A rEmOTE LOCATiON:
the blower can be installed horizontally or vertically. the blower intake maybe installed up or down. use PVc 1 1/2"
pipe and adapters only. whenever possible, use two 45° elbows instead of one 90° elbow to change the direction of
your pipe. glue all pipe connections along the extension you have added. But dO nOt glue the pipe going into the
blower; use the screw you removed when the blower was removed.
The blower should be 6" off the floor or from the ceiling and the air intake end of the blower should be at least 4"
from any walls or joists.
To reduce heat loss, insulate the pipe.
Mount the control Box close to the blower and the Ac outlet. Plug in the key pad cable, blower cable, water level sen-
sor cable and attach the chromatherapy Led light wires. (see diagram 8B) now plug into a minimum 15 amp, 110
vac that is gFci protected.
4''
Blower
Ac Outlet
6''
8B
AquAtic industries, inc.
remote installation in adjacent space (closet) (example only)
Low Voltage
cord to Keypad
check Valve
chromatherapy
Led Light
control Box
All models except freestanding models
check Valve
8A
to: 110 vac minimum 15 amp
dedicated gFci protected circuit
water sensor wires
(Black and red)
Located by drain
to Key Pad
Blower
Blower
screw
screws (4)
-- hold blower to base
to Blower
chromatherapy Led
Light - 2 wires
water Level sensor
to ir sensor
(not on freestanding models)
(not used)
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents