Aquatic Serenity Series Owner's Manual & Installation Manual page 16

Serenity series
Table of Contents

Advertisement

iNSTALLATiON iNSTruCTiONS
SErENiTy STudiO 17, 23, 24, 25 ANd 26 iNSTALLATiON:
Before the floor installation is complete, make sure the floor is level. Once the floor installation is complete, determine
the exact location of the bath and trace the contour of the bath with an erasable marker pen.
For information on electrical installation, maintenance and care, troubleshooting and warranty, please refer to the table
of contents.
1. determine the exact location of the drain, air passage and the two anchoring points at each end of the bath (see
following diagrams).
21 3/8"
Blower
Fitting
Serenity Studio 17
BLOwer
Fitting
BLOwer
Fitting
Serenity Studio 24
Serenity Studio 23
BLOwer
BLOwer
Fitting
Fitting
Bottom View
Serenity Studio 25
Serenity Studio 26
16
AquAtic industries, inc.

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Aquatic Serenity Series

Table of Contents