Cable Management System Installation; Seismic Brace Installation - HP BladeSystem c7000 Setup And Installation Manual

Bladesystem c7000 carrier-grade enclosure
Hide thumbs Also See for BladeSystem c7000:
Table of Contents

Advertisement

Cable management system installation

1.
Install one cage nut into the bottom holes of U5 or U9 (U16 and U20) in the rear mounting
rails.
2.
Attach the cable management system to each rear rail, making sure to attach it to the cage
nut.

Seismic Brace installation

1.
Install two cage nuts into the top and middle holes of U21 (U10) in the rear mounting rails.
2.
Install cage nuts into the center hole of U22 (U1 1) in the front and rear mounting rails.
3.
From the front, slide the top brace on top of the enclosure.
Enclosure installation
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents