Cable management system installation
1.
Install one cage nut into the bottom holes of U5 or U9 (U16 and U20) in the rear mounting
rails.
2.
Attach the cable management system to each rear rail, making sure to attach it to the cage
nut.
Seismic Brace installation
1.
Install two cage nuts into the top and middle holes of U21 (U10) in the rear mounting rails.
2.
Install cage nuts into the center hole of U22 (U1 1) in the front and rear mounting rails.
3.
From the front, slide the top brace on top of the enclosure.
Enclosure installation
33