Figure 5 Joining adjacent cabinets
Enclosure installation
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the rack.
Install the heaviest item first, and continue to populate the rack from the bottom to the top.
IMPORTANT:
Install all cage nuts for the enclosure, seismic brace, and cable management system
before installing the enclosure. Cage nuts can not be installed post-installation of a c7000 CG
enclosure.
NOTE:
The following procedures are for installing a c7000 Carrier-Grade enclosure into the
center of the rack. For a lower c7000, use the U locations in parenthesis.
The most current documentation for HP BladeSystem components is available at the HP website
(http://www.hp.com/go/bladesystem/documentation).
Enclosure installation
31