Preparing The Rails For Integrated Shipping - HP R1500 - UPS XR User Manual

Hp 3 phase ups user guide
Table of Contents

Advertisement

Insert screws through the mounting rail into the cage nuts or clip nuts.
4.
Tighten the wing nuts or hex nuts.
5.

Preparing the rails for integrated shipping

If the unit is to be shipped in a rack:
Remove the hex nuts from the mounting rail.
1.
Install the rail reinforcement plates and tighten using the hex nuts with captive washers, included in the
2.
kit, instead of the nuts included with the rail.
ERM installation 58

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 phase series

Table of Contents