Download Print this page
HP 3 Phase UPS User Manual
HP 3 Phase UPS User Manual

HP 3 Phase UPS User Manual

Hp 3 phase ups user guide
Hide thumbs Also See for 3 Phase UPS:

Advertisement

Quick Links

hp ups r12000 xr
models extended
runtime module

installation instructions

Read instructions completely before beginning

installation procedure.

© 2002 Hewlett-Packard Development Company, L.P.
Hewlett-Packard Company shall not be liable for technical or editorial errors or
omissions contained herein. The information in this document is provided "as is"
without warranty of any kind and is subject to change without notice. The warranties
for HP products are set forth in the express limited warranty statements
accompanying such products. Nothing herein should be construed as constituting an
additional warranty.
hp ups r12000 xr models extended runtime module installation instructions
Second Edition (December 2002)
Part Number 221272-002
221272- 002
Overview
These instructions show how to install an extended runtime
module (ERM). The ERM consists of two battery packs in a 4U
chassis. The ERM can be connected directly to an R12000 model
or to another ERM. Up to two ERM units can be connected.
Depending on the load, one ERM can extend the available UPS
runtime by up to 15 minutes.
These instructions assist qualified personnel with the installation of
the HP ERM. Save these instructions for future reference.
Important Safety
Information Numbers
Before installing this product, read the Important Safety
Information guide included with the ERM kit.
WARNING:
The installation of this product must be performed by
individuals who are knowledgeable about the procedures,
precautions, and hazards associated with AC and DC power
products.
The ERM must be connected directly to the uninterruptible
power system (UPS) by a qualified electrician.
The connection of the ERM to the terminals of the UPS must
be performed by a qualified electrician.
There are no user-serviceable components inside.
Regulatory Compliance Information
For regulatory compliance certifications and identification
purposes, the ERMs are assigned a series number, also identified
on the Regulatory Compliance label located on the side of the
ERM. For certification information, always refer to the series
number EO3002B.
NOTE: The rating label on the device provides the class (A or B) of the
equipment. Class B devices have a Federal Communications Commission
(FCC) logo or FCC ID on the label. Class A devices do not have an FCC logo
or FCC ID on the label. After you determine the class of the device, refer to
the UPS user guide for complete regulatory compliance notices.

Installation Considerations

Weight
WARNING: To reduce the risk of personal injury or
damage to the equipment:
Have the floor-loading requirements evaluated by a
84.4 kg
facilities engineer before installation.
186 lb
Observe local occupational health and safety
requirements and guidelines for manual material
handling.
Obtain adequate assistance to lift and stabilize the
product during installation or removal. The ERM
will be unstable when not fastened to the rails.
Remove all batteries to reduce the overall weight
of the product.
Use two people to insert battery modules into the
ERM chassis.

Advertisement

loading

Summary of Contents for HP 3 Phase UPS

  • Page 1: Installation Instructions

    Observe local occupational health and safety © 2002 Hewlett-Packard Development Company, L.P. requirements and guidelines for manual material Hewlett-Packard Company shall not be liable for technical or editorial errors or handling. omissions contained herein. The information in this document is provided “as is”...
  • Page 2: Preparing For Installation

    Preparing the Site Table 1: Component Weights WARNING: To reduce the risk of electrical shock or personal Item Weight injury while performing this procedure, use a Lockout/Tagout Chassis 17.2 kg (38 lb) procedure to isolate the UPS from the AC branch circuit (AC Battery modules (2) 33.6 kg (74 lb) each mains).
  • Page 3: Tools And Materials Required

    Tools and Materials Required 2. Use the rack template tool to measure and mark the screw locations for the rails on the front and rear of the rack. The following tools are needed: • #3 Phillips screwdriver bit • Metric tools —...
  • Page 4 5. Secure the chassis to the rack using the screws and cage nuts 5. Insert the back screws into the cage nuts that were installed in supplied with the rack. step 3. NOTE: After installing the ERM chassis, insert remaining screws for additional support, if any screw holes are unoccupied.
  • Page 5 8. Insert the right battery module (1) and connect the battery 11. Remove the terminal block cover from the UPS. Remove the module connector to the connector in the ERM chassis (2) screws (1), release the cover (2), and remove the cover (3). Set through the rear opening.
  • Page 6 14. Connect the ERM to the UPS with the ERM-to-UPS power cable set included with the ERM kit. In order, connect the green/yellow cable (1) and torque the nut to 25 in-lbs (A) on the UPS and 75 in-lbs on the ERM (B). Connect the black cable (2) and torque the nuts to 160 in-lbs.
  • Page 7: Charging The Batteries

    Completing the ERM Assembly 20. Insert the screws to hold the battery modules in place. Attaching the Bezels 1. Attach the front panel of the ERM chassis with two screws. 21. Replace the electrical access cover on the rear of the ERM chassis.