Installing Or Replacing The Sfb-12 Fabric Board; Board Ejectors; The Sfb-12 Fabric Board - HP Cluster Platform Interconnects v2010 User Manual

Hp cluster platform infiniband interconnect installation and user's guide
Hide thumbs Also See for Cluster Platform Interconnects v2010:
Table of Contents

Advertisement

Figure 6-1 Board Ejectors
1
2
3
4
Figure 6-1
shows the top ejector latches on the fabric boards, and includes the following
information:
1.
Security screws on each board complete the board seating, and lock of the board in place.
2.
The latch release button, which also electronically signals a board extraction request when
you press it.
3.
The latch mechanism. After pressing the button (and waiting for the hot swap LED to
illuminate), lift both ejector latches simultaneously to eject the board.
4.
The hot swap LED. When hot-swapping a board, it is safe to lift the ejector latches only while
this LED is illuminated.
6.2 Installing or Replacing the sFB- 1 2 Fabric Board
You can install up to four fabric boards at the front of the ISR 9288 chassis.
front panel of the fabric board.
Figure 6-2 The sFB-12 Fabric Board
1
The following features are shown in
1.
The board's ejector latches, which incorporate locking buttons.
2.
The hot swap status LED.
3.
The power and info status LEDs.
4.
The 12 pairs of link status LEDs.
Table 6-1
lists and describes the fabric board LEDs.
72
Installing Field-Replaceable Units in the ISR 9XXX Chassis
2
3
4
Figure
6-2:
Figure 6-2
shows the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cluster platform

Table of Contents