Final activities

10 Final activities

10.1 Checking the installation

SYSTEM DAMAGE
through corrosion if water remains in
the solar heating system for an extended
CAUTION!
period after it has been flushed or after
a pressure test.
B Start up the solar heating system im-
mediately after flushing/pressure test
with solar fluid (for instructions on
flushing/pressure test see pump
station instructions). Otherwise, carry
out flushing/pressure test later.
i
USER NOTE
Carry out the final insulating work only
once the appropriate checks have been
performed.
Checks
Corrugated pipe connector, end caps and
1.
connection pipes secured with clips?
Profile rails connected to roof hook and slid-
2.
ing nut?
Anti-slip protection installed and clicked into
3.
place in profile rails?
Sensor inserted as far as it will go and se-
4.
cured with clamped joint?
Pressure test carried out and all connections
5.
leak-proof (see pump station instructions)?
i
USER NOTE
If you are venting the solar heating sys-
tem with an automatic air vent valve (ac-
cessory), you must close the ball valve
after the venting procedure (see pump
station installation instructions).