Worcester FKT Series Installation Instructions Manual page 37

Flat panel solar collectors, roof mounting for worcester solar heating systems
Table of Contents

Advertisement

8.2.1 Fitting the air vent valve under the roof
B Push connection pipe (Fig. 56, Item 3) onto the flow
connection on the collector array and fix in place us-
ing bracket (Fig. 56, Item 5).
B Feed connection pipe together with the sensor cable
through the ventilation tile (Fig. 56, Item 4) and
through the roof insulation.
Perform the same procedure with the return connection.
B Remove nut and compression fitting from connection
pipe.
B Firmly screw connection pipe (Fig. 56, Item 3) and
double threaded fitting (Fig. 56, Item 1) into air pot
(O-ring gasket).
B Connect header pipe to double threaded fitting with
compression fitting (Fig. 56, Item 1).
6 720 613 055 (2006/04)
5
4
Fig. 56 Fitting the air vent valve under the roof
Item 1: Double threaded fitting with O-ring
Item 2: Air pot
Item 3: Connection pipe
Item 4: Ventilation tile
Item 5: Bracket
Header connection
1
3
2
63043966.22-1.SD
63043966.22-1.SD
37

Advertisement

Table of Contents
loading

Table of Contents