Start-Up; Actuator Test; Installation Of Mes Modules - Baxi Bioflo Installation & Servicing Instructions Manual

Pellet central heating system boiler
Table of Contents

Advertisement

For the Service Technician

4.5.2 Start-up

The auger conveyor and the feed can be selected on the Start-up level with the arrow buttons and the selec-
tion confirmed with the Choose button. A self-test is started at the end of the start-up.
Auger conveyor
The auger conveyor can be switched on for 6 minutes.
Feed
Depending on the set feed system, the feed and each probe including pur-
ging can be started up.

4.5.3 Actuator test

The following actuators can be selected with the arrow buttons, then confirmed and started using the Choose
button. The actuators are switched off again after 1 minute. A self-test is started at the end of an actuator test.
– Induced draught fan
– Auger conveyor
– Ash removal
– Ignition element
– Ash compression
– Suction turbine
– Probe switching
– Boiler pump

4.5.4 Installation of MES modules

Display when an MES module is installed (connected) or uninstalled (discon-
nected) – Fig. 75.
43
Start-up
Auger conveyor
Feed
Fig. 72
Choose
Back
Induces draught fan
Auger conveyor
Ash removal
Ignition element
Ash compression
Suction turbine
Choose
Back
Fig. 73
Probe switching
Boiler pump
Choose
Back
Fig. 74
Installation procedure
active
.....
(Animated symbol)
Fig. 75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents