Baxi Bioflo Installation & Servicing Instructions Manual page 27

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
– Screw on the gas springs for FireWIN with manual filling (Fig. 24) or the cover holder and cover clamping
plate on the cover for FireWIN with fully automated pellet feed – Fig. 25.
FireWIN with manual filling
Gas spring
Fig. 24
Screwing on gas springs
– Secure the "rear cover" (part 5) using 1 screw – Fig. 26, only for FireWIN with fully automated pellet feed.
– Take pressure gauge provided out of ash pan and screw into shut-off valve at front – Fig. 27.
Fig. 26
Securing the front cover with a screw
FireWIN with fully automated pellet feed
Cover clamp-
ing plate
Cover holder
Fig. 25
Screwing on the cover holder and
cover clamping plate
Fig. 27
Screwing pressure gauge into shut-off valve
26

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents