Baxi Bioflo Installation & Servicing Instructions Manual page 29

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
– Hook in the "rear side panels" (parts 1 and 7) – Fig. 32.
– Secure the "rear left side panel" using a screw at the rear – Fig. 33.
Fig. 32
Hooking in side panels at the rear
– Screw both hinges of the "cladding door" (part 8) onto the left side panel using – Fig. 34.
– Check the setting of the door safety switch; close the door, the door safety switch must be operated about 2 – 3 mm
before the door magnet closes (audible clicking of the switch); adjust the actuation play with the screw if necessary
– Fig. 35.
Fig. 34
Inserting the hinges in the side panel
– Place the "front cover" (part 4) onto the side wall with its pins in the holes provided on the side panel – Fig. 36.
– Press the button (Fig. 37), it must be easy to open the glass cover, align the front cover if necessary.
Fig. 36
Putting on the front cover
Fig. 33
Securing the left side panel using a
screw at the rear
Fig. 35
Checking the setting of the door safety switch
Fig. 37
Checking the button moves easily
28
Screw
door safety switch

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents