For the Electrician
All electrical components (sensors, etc.) on the terminal blocks (screwless spring-type terminals) should be con-
nected with fine-wire PVC sheathed cables and be fixed at the rear with strain reliefs – Figs. 48, 49.
Two separate cables are required for connecting the boiler to the suction turbine or changeover unit – this is a
requirement of the guarantee conditions!
Recommended accessories: Ribbon cable FIRE 042 or FIRE 043; 5 x 2.5 mm
Guide the ribbon cable through the rectangular openings and secure with cable ties as strain relief – Fig. 50.
Each cable must be routed separately together with the delivery and return air hose. The cables can be
routed together with the hoses through the fire protection collars to the suction turbine or to the
changeover unit.
Fig. 48
Terminal blocks in the control
panel
Fig. 50
Cable feed-throughs – rear view
2
and 8 x 1 mm
Fig. 49
Strain reliefs and feed-through
for ribbon cable
35
2
Strain reliefs
Low voltage (230
VAC)
Ribbon cable
Low voltage (230
VAC)
Strain reliefs
Extra-low voltage
Ribbon cable
Extra-low voltage