Baxi Bioflo Installation & Servicing Instructions Manual page 21

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
2.6.2 Storage room and feed system in living area or basement
With this routing variant, to avoid the formation of condensation inside the hoses, the temperature difference
between the boiler installation room, suction turbine, changeover unit, hoses and storage room must not exceed
20 °C.
The configuration of the entire system must comply with technical fire protection requirements in accor-
dance with the applicable regulations, standards and guidelines.
3
5
Fig. 18
FireWIN with feed and storage room in heated living area - View from rear
1 . . . . .Standard hose connection downwards
2 . . . . .Hose connection upwards – accessory: FIRE 041
3 . . . . .Metal pipes for delivery and return air straight – accessory: FIRE 044
4 . . . . .Metal pipes for delivery and return air curved – accessory: FIRE 045
5 . . . . .Fire protection collars incl. masonry attachment – accessory: BIO 010
6 . . . . .Suction turbine
7 . . . . .Fully automated changeover unit – in accessory: PMX 042
8 . . . . .Suction wands in storage room – in accessory: PMX 042
1
A
C
C
B
6
7
B
A
3 x
8
FS . . . .Transport hose
RS . . .Reverse air flow hose
A . . . . .Exhaust pipe
Z . . . . .Air supply connection
H . . . . .Maximum transport height in metres
L . . . . .Maximum hose length in metres
20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents