Baxi Bioflo Installation & Servicing Instructions Manual page 22

Pellet central heating system boiler
Table of Contents

Advertisement

For the Installer
2.6.3 Storage room and/or feed system in unheated non-living areas
(e.g. attic)
If the temperature difference between the boiler installation room, suction turbine, changeover unit, hoses and
storage room is greater than 20 °C, they must be routed as shown in the sketch, Fig. 19. In this case, only 2 suc-
tion probes may be connected as the 3rd connection is the idle position. This 3rd connection must be tightly
sealed to prevent cold air from circulating in the hoses and condensation forming inside them.
The configuration of the entire system must comply with technical fire protection requirements in accor-
dance with the applicable regulations, standards and guidelines.
7
Fig. 19
FireWIN with feed and storage room in unheated living area - View from rear
B
A
C
B
6
2 x
8
A
21
1
C
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bioflo 12 kw pear

Table of Contents