Trane TRACER SUMMIT BMTX-SVU01B-EN Daily Operations page 158

Table of Contents

Advertisement

Running Reports
146
One report is already displayed in the Report Viewer and you want to
run a different report
The connected site is a Tracer 100 site
To run a report:
1. Click the Reports button on the task bar. The Select Report to View
window displays (see Figure 134).
Figure 134. Select Report to View Window
Step 2
Note:
The Standard Trend and Custom options are not available for
Tracer 100 panels.
2. Make sure the Standard Live button is selected.
3. Click OK. The Select Standard Live Report window displays (see
Figure 135).
Figure 135. Select Standard Live Report Type List
step 5
4. If you are using a BCU panel, select the type of object from the Stan-
dard Report Type drop-down list. If you are using a Tracer 100 panel,
Site Reports is your only option.
Step 3
Step 4
BMTX-SVU01B-EN

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tracer summit

Table of Contents