Raytheon UY75 Installation And Maintenance Manual page 45

Dye-extractor
Table of Contents

Advertisement

Maintenance
Machine ________________________
Operator _______________________
Disconnect power to the machine before performing the monthly maintenance procedures.
1. Clean the AC drive fins.
2. Determine if V-belt(s) require(s) replacement or adjustment:
a. Check V-belt(s) for uneven wear and frayed edges.
b. Verify that V-belt(s) is (are) properly aligned.
3. Remove back panel and check hoses for leaks.
4. Tighten motor mounting bolt locknuts and bearing bolt
locknuts, if necessary.
5. Use compressed air to clean lint from motor.
6. Clean interior of machine, both basket and shell, by wiping
with a water-soaked sponge or cloth.
7. Use compressed air to clean moisture and dust from all
electrical components.
8. Check air filter/regulator/lubricator:
a. Drain water from filter bowl.
b. Check level in oil reservoir bowl.
9.
10.
3–8
Monthly Preventive Maintenance Checklist
Checks
OBSERVE ALL SAFETY WARNINGS!
Quarterly Preventive Maintenance Checklist
Month
F232048

Advertisement

Table of Contents
loading

Related Products for Raytheon UY75

This manual is also suitable for:

Uy160Uy230

Table of Contents