Installation
Air Requirements
A clean, dry compressed air source is required
to operate the drain valve(s) and the supply
tank drain valves. The compressed air inlet for
the machine is on the rear of the machine.
Air Supply Information
Air inlet connection size, in/mm
Number of air inlets
Recommended air pressure,
psi/bar
Functioning limits, psi/bar
Control Function Test
The machine should be cleaned after
the installation is complete. A function test
should then be executed on the unloaded
machine:
1. Verify that the wire tie which keeps the
door lock open is removed.
2. Check the power supply for such
characteristics as correct voltage, phase,
and cycles to be certain they are correct for
the machine.
3. Open manual shut-off valves to
the machine.
4. Turn on electric power.
5. Check the door interlock before starting
operation:
2–26
1/4 / DN6
1
90-95 /
6.0-6.3
90-100 /
6.0-6.7
6. Run a complete cycle, checking operation
7. Rotation must be forward in the extract
a. Open the loading door by pressing and
holding the door unlock button on the
front of the control panel and then
pressing the door handle button and
turning the handle clockwise.
b. Attempt to start the machine
with the door open. The machine
should not start with the
door open.
c. Close the door without locking it and
attempt to start the machine. The
machine should not start with the door
unlocked.
d. Close and lock the door and start a
cycle. Attempt to open the door while
the cycle is in progress. The door
should not open.
e. Open the sample port while the cylinder
is rotating. The cylinder should stop.
If the door lock and interlock are
not functioning properly, call a
service technician.
of water inlet valves, drain, and extract
functions.
step. If rotation is not forward in the
extract step, disconnect power. A qualified
electrician must reverse any two leads
between the AC inverter drive and the
motor.