End Of Day; Weekly; Monthly - Raytheon UY75 Installation And Maintenance Manual

Dye-extractor
Table of Contents

Advertisement

Maintenance
Daily (Continued)
Note: Leave loading door open at the end of
each completed cycle to allow moisture to
evaporate. Unload the machine promptly after
each completed cycle to prevent moisture
buildup.

End of Day

1. Clean the two fan intake filters located on
either side of the
control enclosure.
a. Snap off the external plastic cover
which contains the filter. Remove the
foam filter from the cover.
b. Wash the filter in a mild soap solution
or vacuum it clean.
2. Clean the door gasket of residual
chemicals and all foreign matter.
3. Flush supply tanks with clean water.
4. Clean the machine's top, front, and
side panels with mild detergent. Rinse
with clean water.
5. Leave loading door open at the end
of each day to allow moisture
to evaporate.
3–2

Weekly

1. Check the machine for leaks.
a. Start an unloaded cycle to fill
the machine.
b. Verify that door and door gasket do not
leak.
c. Verify that the drain valve
is operating.

Monthly

Note: Disconnect power to the machine at its
source before performing the monthly mainte-
nance procedures.
1. Clean the AC drive fins:
a. Remove the top and right side of the
control module as seen from the front.
b. Blow the fins clean using compressed
air at a pressure of 60–90 psi or canned
compressed air. Use care to avoid
damaging cooling fan or other
components.
Note: No amount of visible foreign matter
should be allowed to accumulate on the fins or
the finger guard.
F232048