Raytheon UY75 Installation And Maintenance Manual page 27

Dye-extractor
Table of Contents

Advertisement

Installation
Mechanical Installation (Continued)
10. Before grout sets completely, make a drain
opening in the rear of the machine
grouting with a stiff piece of wire; this
opening should be approximately 1/2" (13
mm) wide to allow any surface water
build-up under the base of the machine to
drain away.
11. Attach the washers and locknuts to the J-
bolts.
12. Tighten the lock nuts by even
increments—one after the other—until all
are tightened evenly and the machine is
fastened securely to the floor. See Figure
2–14.
Figure 2–14.
Figure 2–15 shows the completed J-bolt
installation with grout.
Figure 2–15.
2–16
1
Lock Nut
2
Machine Base
3
1/2" (13 mm) Machinery Grout
4
5/8" (19 mm) diameter J-bolt
Note: Check and retighten the locknuts after
five to ten days of operation and every three
months thereafter.
F232048

Advertisement

Table of Contents
loading

Related Products for Raytheon UY75

This manual is also suitable for:

Uy160Uy230

Table of Contents