Installation
Mechanical Installation (Continued)
5. Use compressed air or a squeeze bulb to
remove debris from the hole. See Figure
2–8.
Figure 2–8.
6. Install the machine anchors using the
included tool.
7. Secure the machine to the floor using the
bolts furnished with the anchors. See
Figure 2–9.
Figure 2–9.
2–14
The completed expansion bolt installation is
shown in Figure 2–10.
Figure 2–10.
1
Washer
2
Lock Nut
3
Machine Base
4
5/8" (19 mm) diameter Expansion Bolt
Note: Check and retighten the locknuts after
five to ten days of operation and every three
months thereafter.

J-Bolt Installation

Install J-bolts in concrete per the mounting
bolt layout in Figure 2–4. Use the following
instructions and Figures 2–11 through 2–15 as
a guide to step-by-step installation of the
J-bolts.
1. Verify that the floor is at least 4" (102 mm)
thick and of good quality. If the floor fails
to meet the above requirements, a concrete
foundation pad must be constructed.
2. Adjust the drill depth gauge to match the
length of the J-bolt, minus
1-1/2" (38 mm). See Figure 2–11.
F232048