Maintenance; Daily; Beginning Of Day - Raytheon UY75 Installation And Maintenance Manual

Dye-extractor
Table of Contents

Advertisement

Routine maintenance maximizes
operating efficiency and minimizes downtime.
The maintenance procedures described below
will prolong the life of the machine and help
prevent accidents.
CAUTION
Replace all panels that are removed to
perform service and maintenance
procedures. Do not operate the machine
with missing guards or with broken or
missing parts. Do not bypass any
safety devices.
Daily, weekly, monthly, and quarterly check-
lists are provided at the end of this section.
Laminate the checklists to
preserve them for repeated copying.
Operators and technicians are
encouraged to add checks specific to their
machine's particular application. Space is pro-
vided on the checklists for
this purpose.
The following maintenance procedures must
be performed regularly at the required inter-
vals.
F232048
Section 3

Maintenance

Daily

1. Inspect water inlet valve hose
connections on the back of the machine for
leaks.
2. Inspect steam hose connections
for leaks.
3. Verify that insulation is intact on
all external wires and that all
connections are secure. If bare wire is
evident, call a service technician.
4. Check door interlock before
SW019
starting operation:
a. Attempt to start the machine with the
b. Then, close the door without
c. Close and lock the door and start a
If the door lock and interlock are
not functioning properly, call a
service technician.

Beginning of Day

door open. The machine should not
start with the
door open.
locking it and attempt to start the
machine. The machine should not start
with the door unlocked.
cycle. Attempt to open the door while
the cycle is in progress. The door
should not open.
3–1

Advertisement

Table of Contents
loading

Related Products for Raytheon UY75

This manual is also suitable for:

Uy160Uy230

Table of Contents